-
About us
-
About us
Downer is listed on the Australian Securities Exchange and employs more than 31,000 people.
Learn more
-
-
What we do
-
What we do
Downer is a leading provider of integrated services in Australia and New Zealand.
-
-
Investors
-
Investors
View our latest ASX announcements as well as financial reporting, key dates and shareholder information.
Learn more
-
-
News and media
-
News and media
View the latest news from Downer as well as our capability brochures.
Learn more
-
-
Sustainability
-
Sustainability
We understand the importance of having a responsible and forward-thinking approach to sustainability.
Learn more
-
-
People and careers
-
People and careers
Our people are fundamental to the culture and success of Downer.
Learn more
-
-
Contact us
-
Contact us
Downer has over 300 sites across Australia and New Zealand with our head office based in Sydney.
Learn more
-
Downer Case Study
Adaptive reuse for the University of Auckland
08/09/2022
Downer’s Hawkins business is delivering the rebuild of the University of Auckland’s Social Sciences building. But this is no ordinary rebuild.
Downer and Hawkins have partnered with the university to deliver a new benchmark in sustainable vertical infrastructure in New Zealand.
Instead of knocking down the old building and starting again, we have stripped it back and kept as much of the original concrete shell as possible.
Reinforcement textiles and fabrics have been used to upgrade the existing structural frame to meet seismic standards, and we are now completing the rebuild with a new façade and interior refit. It will look and feel like a new building, but underneath it will be the same concrete frame.
To ensure the ongoing use of the current structure, the concrete cladding has been replaced with a lightweight system providing an additional floor. Further additions include:
- High-performing glass to reduce solar glare
- Low emissions paint and coatings
- Improved heating, ventilation and air conditioning systems to provide clear air and greater ventilation rates.
Due to open in 2024, the 50-year-old structure has set new benchmarks for low-carbon design and sustainability. It will send less waste to landfill, create less pollution through its construction and operation and provide comfortable and functional spaces for thousands of students who work, learn and socialise at the university. The upfront carbon emissions for the rebuild is estimated to be equivalent to around 250kg CO2e/m2 – a 40-60 per cent reduction on a standard new build.
“This is a challenging project, but has huge sustainability benefits and positive social outcomes,” Project Manager, Sam Gordon, said. “The end result will be a modern new building, except we haven’t had additional emissions or sent unnecessary materials to landfill.”
The project was awarded 93/100 by the New Zealand Green Building Council, achieving a 6 Green Star design rating. This is the highest awarded score since the inception of the rating, putting the building design in the ‘World Leadership’ category. This initiative demonstrates Downer’s contribution to achieve the following Sustainable Development Goals:
Categories
Related articles
-
15/06/2023
Unlocking frontline knowledge
Read more -
08/09/2022
Circular economy in action
Read more -
08/09/2022
An ACE solar solution
Read more -
01/07/2022
Heritage management on Eyre Peninsula
Read more -
10/04/2022
DM Roads deliver Australian first surface solution
Read more -
15/03/2022
The Downer-Bama partnership
Read more -
06/01/2022
Downer a leader in resource recovery
Read more -
01/11/2021
Downer joint venture receives award at 2021 Civil Contractors Federation (CCF) Earth Awards
Read more