As part of the Peacocke Whatukooruru Drive development, Downer constructed two bridges across the Mangakootukutuku Stream gullies and associated tributaries, to improve connectivity. The 66m Eastern Gully Bridge consisted of a three span single hollow core beam bridge, while the 85m Mangakootukutuku Gully Bridge saw construction of a three span precast super tee beam bridge.
Discover more View all
North and South Canterbury Network Outcomes Contracts
How Downer kept Canterbury’s State Highways moving Overview For around...
Read case study
Stronger Christchurch Infrastructure Rebuild Team (SCIRT)
Rebuilding the foundations of a city Overview Following the Canterbury...
Read case study
SH1 Russley Road Upgrade
Safer, more reliable gateway to Christchurch Delivered by the McConnell...
Read case study